Development build — sample configuration

Read the water balance and losses by zone

Compare the water entering each metered zone with authorized and billed consumption using the IWA method, see non-revenue water, and record closed periods.

Updated on

The Water balance screen shows how much water entered the system, how much was consumed with authorization and how much was lost, for one metered zone or the whole system. Any role with network access can view it; recording a closed period is for the Owner, Administrator and Operations roles.

Before you start#

  • At least one zone under Network → Metered zones, with an Inflow meter chosen and measurements from that meter in the period.
  • Consumption assigned to the zone: in Topology, Customer service line nodes that carry a Customer meter. When the service area has a single zone, every meter in the area counts.
  • To record periods, a Zone inlet node linked to that zone in the topology.

Step 1: Choose the scope and the period#

  1. In the menu, under Network, open Water loss and then Water balance.
  2. Under Scope, keep Whole system or pick one zone.
  3. Adjust the From and To dates.
  4. To split the losses, type into Apparent losses (%) the share you assume for meter under-registration and unauthorized use.

Step 2: Read the result#

  1. In the IWA component table, read System input, Authorized consumption (split into Billed and Unbilled), Water losses and Non-revenue water, each with its % of input.
  2. With a percentage entered, Water losses splits into Apparent losses and Real losses. Without one, the split is left out.
  3. For Whole system, the By zone table gives each zone's Status: Computed, Partial data or Insufficient data.
  4. For a single zone, check Data source and Night flow, which compares flow between 2 am and 4 am with previous nights and lists Nights with a suspected burst.

Step 3: Record a closed period#

  1. With one zone chosen and a period that has ended, click Record period under Recorded periods.
  2. Confirm with Record.

What happens next#

The period is saved with the message Balance recorded and cannot be changed afterwards. Recording the same period again with different figures adds a new Revision, and the earlier one stays listed. You can export the list as CSV. Zones with Insufficient data are left out of the system totals, and the Warnings section explains what was missing for each.

Common problems#

  • You see "The inlet metering or the assigned consumption is missing. Without both, losses cannot be calculated for this period." The zone has no inflow meter with measurements in the period, or no customer meter is assigned to it. Complete the zone and its service lines in the topology.
  • You see "Invalid period. The end date must be after the start date and the period cannot exceed one year." Put the From and To dates in order, or shorten the range.
  • An area has several zones and one shows no consumption. Without service lines carrying meters, that zone's consumption is not assigned, so the same meters are never counted twice. Add the zone's Customer service line nodes.
  • Record period is greyed out. The note below it gives the reason: the period has not ended, the data is incomplete, or the zone needs an inlet in the topology.

Start today. Set up your utility in minutes.