Development build — sample configuration

Register, install and exchange meters

Register meters on an account or receive them into a warehouse, install them on a connection with an initial reading, and exchange a faulty meter without breaking consumption history.

Updated on

Every meter feeds the readings that become invoices, so its record and any swap in the field must be right. These tasks belong to the Operations, Administrator and Owner roles.

Before you start#

  • The customer's account is active. A meter can only be linked to an Active account, and installation also needs the connection's account to be active.
  • To install or exchange, the connection already exists under Connections.
  • For meters bought for stock, someone who also has inventory access uses Receive meters; each received meter stays In warehouse until it is installed.

Step 1: Register a meter on an account#

  1. In the menu, open Properties and choose the Meters tab.
  2. Click New meter.
  3. Pick the Account and type the Serial number.
  4. Check the Unit (the form suggests m3) and the Register decimal places, one digit from 0 to 9.
  5. Under Meter role, keep Standard meter or choose Master meter or Sub-meter. A sub-meter asks for its Parent master meter.
  6. Set Installed on if it was not today, then click Save.

Step 2: Install a warehouse meter on a connection#

  1. Under Meters, open the meter whose status is In warehouse.
  2. Open More actions and choose Install meter.
  3. Choose the Connection (the list only offers connections without a meter) and enter the Initial reading.
  4. If you track stock, set Taken from to the warehouse or van holding the meter.
  5. Fill in Seal number and Installation date, then click Install.

Step 3: Exchange a faulty meter#

  1. Open the installed meter and click Exchange meter. The exchange has three steps.
  2. Meter to remove: confirm the Connection, enter the Final reading of the removed meter and pick Where the removed meter goes: In testing, Return to the warehouse or Scrapped. Click Continue.
  3. New meter: choose the meter from the warehouse, the Initial reading of the new meter and the Exchange date. Click Continue.
  4. Seal and confirmation: enter the Exchange reason and Seal number, check the summary and click Confirm exchange.

What happens next#

On installation the meter becomes Active and its initial reading is stored as an accepted reading, listed under Readings on the meter page. The installation shows in Installation history. In an exchange, the final reading closes consumption on the removed meter, which turns Inactive, and the start reading opens the new meter on the same account, so billing carries on without a jump.

Common problems#

  • "No connections without a meter": every connection already has a meter installed. To replace the device on a connection use Exchange meter, not Install meter.
  • "No meters in the warehouse" on the second exchange step: record the new meter's arrival first with Receive meters.
  • Registration or exchange is refused because of the date: installation and exchange dates cannot be in the future, and an exchange cannot predate the removed meter's installation.
  • You retired a meter by mistake: Retire is permanent; the meter stops receiving readings and cannot be used again. For a temporary stop use Deactivate, which Activate reverses.

Start today. Set up your utility in minutes.