Handle leak allowance requests
Set the allowance policy, schedule an on-site inspection, record its result, then approve the invoice credit or reject the request with a reason.
Updated on
After repairing a hidden leak, a customer with an unusually high bill can ask for a leak allowance. Operations or Customer service staff schedule and record the inspection; Finance, Administrator or Owner makes the final decision.
Before you start#
- The policy is in place. On Leak allowances, the Policy button (shown to people who can decide) opens Leak allowance policy, with Allow leak allowance requests, Credit on excess (basis points, 5000 = 50%), Historical average months, Months between allowances, Minimum excess above average (basis points), Days after the due date to submit a request and Require proof of repair.
- The customer has sent the request from the portal under Leak allowance, choosing an unpaid invoice. The system only accepts it when the invoice meets the policy, and it works out the Proposed credit there and then.
Step 1: Open the request#
- In the Billing menu, open the Leak allowances tab.
- Filter by status, for example Submitted, and click the invoice row.
- Check Consumption, Historical average, Excess and Proposed credit. If the customer attached evidence, click Proof of repair to open it.
Step 2: Schedule and record the inspection#
- Click Schedule inspection. The request moves to Inspection scheduled and is linked to a work order, shown in the Inspection field.
- After the site visit, open the request again and click Record inspection.
- In Inspection result, answer Was the leak confirmed and repaired? with Yes or No and fill in Notes.
- Click Save. The status changes to Inspected.
Step 3: Decide#
- To grant the credit, click Approve credit, add Notes (optional) and click Confirm. Approval issues a credit note on the invoice and cannot be reversed from this page.
- To decline, click Reject request, fill in Reason and confirm. You can reject at any stage before a decision is made.
What happens next#
An approved request becomes Credited and shows the Issued credit. The credit note appears under Credit and debit notes and lowers the invoice balance. In the portal, the customer sees "Credit applied to invoice" or, after a rejection, "Request not approved". Scheduling, inspection and decision are all written to the audit log. Use Export on the list to download the filtered requests as CSV.
Common problems#
- Approval is refused because the request no longer meets the policy: the inspection answered No, or the account already received an allowance within Months between allowances, which is checked again at decision time. Reject the request and give the reason.
- You cannot approve your own request: when a staff member registered the request, that same person cannot approve it. Ask another decision maker.
- Customers say they cannot apply: the message "The water utility is not granting leak allowances at this time." means Allow leak allowance requests is switched off. Other portal refusals explain the cause, such as a passed deadline or too little consumption history.
- Save or Confirm does nothing: inspection Notes and the rejection Reason are required.